• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Blade Folder Hoses and Flow Valves Removal.
Figure 7. Blade Folder Hose Clamps Installation.

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  163    164    165    166    167  168  169    170    171    172    173  
img
.
TM 5-2350-377-13&P
0042
INSTALLATION
1.
Install two blade folder hoses (Figure 6, Item 3) to top and bottom flow valves of port 2
(Figure 6, Items 1 and 2) and route under radiator and up in front of radiator next to muffler plate.
1
2
3
M0069HBF
Figure 6.
Blade Folder Hoses and Flow Valves Installation.
0042-4
03/15/2011Rel(1.8)root(maintwp)wpno(M00014)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.