TM 5-3805-260-24
BOWL AND EJECTOR CONTROL VALVE
12.
Install sleeve (36) on valve spool (23). Install
the valve spool in the body.
13.
Install O-ring seal (41) in cap (37). Put the seals
on valve spool (38) and plug (40). Install valve
spool (38), spring (39) and plug (40) in cap (37).
NOTE: Put 4L7464 Silicone Grease on the ends of the
valve spools before the installation of the caps.
14.
Install cap (37) and two bolts (42). Install the
seal in cap (44) and three balls (43) on the valve
spool. Install cap (44) on the valve spool and
install two bolts to hold it. Tighten the four bolts
to a torque of 10 to 13 lb. ft. (14 to 18 N. m).
NOTE: Put 4L7464 Silicone Grease on the ends of the
valve spools before the installation of the rubber seals.
15.
Install washers (45), retainers-(47) and rubber
seals (46) on the valve spools. Install the four
screws that hold the retainers.
end by:
a)
install bowl and ejector control valve