• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Headlight Wiring Harness Installation.
Figure 2. Blade Folder Wiring Harness Installation.

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  78    79    80    81    82  83  84    85    86    87    88  
img
. . . .
TM 5-2350-377-13&P
0024
FIELD MAINTENANCE
BLADE FOLDING WIRING HARNESS REPLACEMENT
INITIAL SETUP:
References
Tools and Special Tools
TB 43-0001-39
Tool Kit, General Mechanic's: Automotive
(WP 0071, Table 1, Item 7)
Stand, Vehicle
Equipment Condition
(WP 0071, Table 1, Item 6)
Front of vehicle blocked (TM 5-2350-262-20)
Hydraulic system pressure relieved
(TM 5-2350-262-20)
Personnel Required
Construction Equipment Repairer, 91L
REMOVAL
NOTE
Refer to TB 43-0001-39 Series for all wiring harnesses not shown for Repair task.
1.
Remove bilge pump light lead #450 (Figure 1, Item 2) from blade folder harness lead #515 (Figure 1, Item 1).
2.
Remove blade folder harness lead #514 (Figure 1, Item 5) from control box power harness (Figure 1, Item 3)
leads.
3.
Remove hull wiring harness leads (Figure 1, Item 6) from blade folder harness (Figure 1, Item 7) leads.
4.
Remove blade folding wiring harness (Figure 1, Item 8) from hull (Figure 1, Item 4).
2
3
1
8
7
6
5
4
M0091HBF
Figure 1. Blade Folder Wiring Harness Removal.
END OF TASK
0024-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00019)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.