• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Blade Folder Wiring Harness Installation.
CONTROL BOX POWER WIRING HARNESS REPLACEMENT - Continued

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  80    81    82    83    84  85  86    87    88    89    90  
img
. . . .
TM 5-2350-377-13&P
0025
FIELD MAINTENANCE
CONTROL BOX POWER WIRING HARNESS REPLACEMENT
INITIAL SETUP:
References
Tools and Special Tools
TB 43-0001-39
Tool Kit, General Mechanic's: Automotive
(WP 0071, Table 1, Item 7)
Shop Equipment, Field Basic
Equipment Condition
(WP 0071, Table 1, Item 5)
Front of vehicle blocked (TM 5-2350-262-20)
Hydraulic system pressure relieved
(TM 5-2350-262-20)
Personnel Required
Construction Equipment Repairer, 91L
REMOVAL
NOTE
Refer to TB 43-0001-39 Series for all wiring harnesses not shown for Repair task.
1.
Remove four screws (Figure 1, Item 2) on ejector panel (Figure 1, Item 1) and move panel downward, retaining
screws for future use.
1
2
M0093HBF
Figure 1.
Control Box Power Wiring Harness Removal.
0025-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00020)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.