• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONTROL BOX POWER WIRING HARNESS REPLACEMENT
CONTROL BOX POWER WIRING HARNESS REPLACEMENT - Continued

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  81    82    83    84    85  86  87    88    89    90    91  
img
.
TM 5-2350-377-13&P
0025
REMOVAL - Continued
2.
Remove screw (Figure 2, Item 3) and control box power harness ground terminal (Figure 2, Item 5) from bilge
pump light ground (Figure 2, Item 1).
3.
Install ejector panel (Figure 2, Item 4) to hull with four screws (Figure 2, Item 2) retained from Step (1).
1
5
4
3
2
M0094HBF
Figure 2.
Control Box Power Wiring Harness Removal.
0025-2
03/15/2011Rel(1.8)root(maintwp)wpno(M00020)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.