TM 5-2350-377-13&P
0025
REMOVAL - Continued
2.
Remove screw (Figure 2, Item 3) and control box power harness ground terminal (Figure 2, Item 5) from bilge
pump light ground (Figure 2, Item 1).
3.
Install ejector panel (Figure 2, Item 4) to hull with four screws (Figure 2, Item 2) retained from Step (1).
1
5
4
3
2
M0094HBF
Figure 2.
Control Box Power Wiring Harness Removal.
03/15/2011Rel(1.8)root(maintwp)wpno(M00020)